(E) Future Networks (PNL-3) - 2012
Future networks (2012)
Operational Bulletin No. 716 (15.V.2000)
Operational Bulletin No. 716 (15.V.2000) (15.05.2000)
Future networks (2012)
Future networks (2012)
Volume IX: Méthodes d'essai et appareils
Volume IX: Méthodes d'essai et appareils de mesure (Volume IX)
Operational Bulletin No. 750 (15.X.2001)
Operational Bulletin No. 750 (15.X.2001) (15.10.2001)
Preservation of Wooden Poles Carrying Ov
Preservation of Wooden Poles Carrying Overhead Telecommunication Lines (2009)
Volume VII: Mesures de protection et pré
Volume VII: Mesures de protection et précautions de sécurité (Volume VII)
(A)Practical Proc. Subjective Test. 2011
Practical procedures for subjective testing (2011)
Directives concerning the protection
Directives concerning the protection of telecommunication lines against harmful effects from electric power and electrified railway lines - Volume VI: Danger, damage and disturbance (2008)
Preservation of Wooden Poles Carrying Ov
Preservation of Wooden Poles Carrying Overhead Telecommunication Lines (2009)
"Volume V: Courants et tensions inducte
"Volume V: Courants et tensions inducteurs dans les systèmes de transport et de distribution d'énergie " (Volume V)
Volume IV: Inducing currents and voltage
Volume IV: Inducing currents and voltages in electrified railway systems (Volume IV)